SCOPE
APPLICATION
PURPOSE
ENERGY CONTROL PROGRAM
LOCKOUT/TAGOUT
FULL EMPLOYEE PROTECTION
ENERGY CONTROL PROCEDURE
PROTECTIVE MATERIALS AND HARDWARE
PERIODIC INSPECTIONS
ENERGY ISOLATION
NOTIFICATION OF EMPLOYEES
LOCKOUT/TAGOUT POLICIES AND PROCEDURES
PURPOSE
RESPONSIBILITY
PREPARATION FOR LOCKOUT/TAGOUT
SEQUENCE OF LOCKOUT/TAGOUT SYSTEM PROCEDURE
RESTORING MACHINES OR EQUIPMENT TO PRODUCTION OPERATIONS
PROCEDURE INVOLVING MORE THAN ONE PERSON
BASIC RULES FOR USING LOCKOUT/TAGOUT SYSTEM PROCEDURE
LOCKOUT/TAGOUT SEQUENCE
APPLICATION OF CONTROL
PREPARATION FOR SHUTDOWN
MACHINE OR EQUIPMENT SHUTDOWN
MACHINE OR EQUIPMENT ISOLATION
LOCKOUT OR TAGOUT DEVICE
LOCKOUT/TAGOUT DEVICE REMOVAL
OUTSIDE PERSONNEL
SHIFT OR PERSONNEL CHANGES
LOCKS
DANGER TAGS
WARNING
EMPLOYEE TRAINING:
ENFORCEMENT/INSPECTION:
LOCKOUT/TAGOUT PROCEDURE
LINE BREAKING
UNPLUGGING BLEEDERS GUIDELINES
BLEEDER CLEANER OPERATING INSTRUCTIONS
PIPING STRAY CURRENT GUIDELINE
GLOSSARY